A Triang Minic clockwork breakdown truck, green cab, red body, a Minic Dairies tanker and one further truck cab for a tanker, (3).
| Estimate: |
£50 - £80
|
|
Hammer price:
|
£85 |
Bidding ended. Lot has been sold.
A Triang Minic clockwork breakdown truck, green cab, red body, a Minic Dairies tanker and one further truck cab for a tanker, (3).